Difference between revisions of "project02:P3WIP"

From uf
Jump to: navigation, search
(BIGGER TRIAL)
Line 26: Line 26:
 
File:EZ 0308201811 (12).jpg
 
File:EZ 0308201811 (12).jpg
 
File:EZ 0308201811 (13).jpg
 
File:EZ 0308201811 (13).jpg
 
 
 
</gallery>
 
</gallery>
  
 
+
==Wood & concrete hybrid==
 
<gallery mode=packed heights=200px style="text-align:left">
 
<gallery mode=packed heights=200px style="text-align:left">
 
File:EZ 06082018.jpg
 
File:EZ 06082018.jpg
Line 37: Line 35:
 
File:EZ 060820184.jpg
 
File:EZ 060820184.jpg
 
File:EZ 060820185.jpg
 
File:EZ 060820185.jpg
 +
</gallery>
 +
 +
==Wood as primary formwork with textile and cables as secondary==
 +
<gallery mode=packed heights=200px style="text-align:left">
 
File:EZ 060820186.jpg
 
File:EZ 060820186.jpg
 
File:EZ 060820187.jpg
 
File:EZ 060820187.jpg
 
File:EZ 060820188.jpg
 
File:EZ 060820188.jpg
 +
</gallery>
 +
 +
===Shotcrete===
 +
<gallery mode=packed heights=200px style="text-align:left">
 
File:EZ 060820189.jpg
 
File:EZ 060820189.jpg
 
File:EZ 0608201810.jpg
 
File:EZ 0608201810.jpg
 
File:EZ 0608201811.jpg
 
File:EZ 0608201811.jpg
 +
</gallery>
 +
 +
==Wood as shuttering==
 +
<gallery mode=packed heights=200px style="text-align:left">
 
File:EZ 0608201812.jpg
 
File:EZ 0608201812.jpg
 
File:EZ 0608201813.jpg
 
File:EZ 0608201813.jpg
 +
</gallery>
 +
 +
==Wood fibres for insulating concrete form (ICR)==
 +
<gallery mode=packed heights=200px style="text-align:left">
 
File:EZ 0608201814.jpg
 
File:EZ 0608201814.jpg
 
File:EZ 0608201815.jpg
 
File:EZ 0608201815.jpg

Revision as of 11:01, 16 August 2018

NEW

Bigger trial - concrete and wood

EZ06082018 BT.gif

Materiality in relation to structural and functional characteristics

EZ020820182.gif

Wood & concrete hybrid

Wood as primary formwork with textile and cables as secondary

Shotcrete

Wood as shuttering

Wood fibres for insulating concrete form (ICR)


02.07

Structural

ParametricSystem

MouldDesign

1

2

3

25.06

Prototyping1

EZ 25620181.jpg

1

2

3

4

Prototyping2

1

Parameters: Concrete position in relation to wood (inbetween), changing direction of beams (vs. linearity)

2

Parameters: Concrete position in relation to wood (inbetween vs. lying over), type of formwork to be implemented (textile vs. wood)

3

Parameters: Wood formwork, materiality of wood formwork


4

Parameters: Thickness of floor (double shell)

5

Parameters: Thickness of floor (double shell)


Devices

References on devices

Prototypying

1Ventilation

Parameters: Integration of devices (ventilation) into the system

2Light

Parameters: Integration of windows into the system, flat windows vs. protruding

3Light

Parameters: concave vs. convex

4Light

Parameters: Fibreglass

5Heating

Parameters: Integration of devices (ventilation) into the system

Structural

1A

Parameters: Closest support point (micro area)


1B

Parameters: closest support point (macro area)

2

Parameters: areas of higher compression or tension


OLDER

Gyroid

Gfin 1c.gif EZ 2004 1.jpg EZ 2004 2.jpg


Furniture


References

Fabrication: wood

Reframing


References_2