project02:P3WIP

From uf
Revision as of 16:16, 3 August 2018 by Erik (Talk | contribs)

Jump to: navigation, search

EZ020820182.gif


02.07

Structural

ParametricSystem

MouldDesign

1

2

3

25.06

Prototyping1

EZ 25620181.jpg

1

2

3

4

Prototyping2

1

Parameters: Concrete position in relation to wood (inbetween), changing direction of beams (vs. linearity)

2

Parameters: Concrete position in relation to wood (inbetween vs. lying over), type of formwork to be implemented (textile vs. wood)

3

Parameters: Wood formwork, materiality of wood formwork


4

Parameters: Thickness of floor (double shell)

5

Parameters: Thickness of floor (double shell)


Devices

References on devices

Prototypying

1Ventilation

Parameters: Integration of devices (ventilation) into the system

2Light

Parameters: Integration of windows into the system, flat windows vs. protruding

3Light

Parameters: concave vs. convex

4Light

Parameters: Fibreglass

5Heating

Parameters: Integration of devices (ventilation) into the system

Structural

1A

Parameters: Closest support point (micro area)


1B

Parameters: closest support point (macro area)

2

Parameters: areas of higher compression or tension


OLDER

Gyroid

Gfin 1c.gif EZ 2004 1.jpg EZ 2004 2.jpg


Furniture


References

Fabrication: wood

Reframing


References_2