Difference between revisions of "LM 2017-09-13"

From uf
Jump to: navigation, search
(Lunch Meeting 2017-09-13)
(Lunch Meeting 2017-09-13)
Line 8: Line 8:
  
 
Topics for discussion:  
 
Topics for discussion:  
Roel: email topic lecture Pirouz  
+
Roel: email topic lecture Pirouz
 +
 
logo's social media
 
logo's social media
 +
 
also how do i enter an enter in this page :-)
 
also how do i enter an enter in this page :-)
 +
 +
 +
Meeting 13 9
 +
 +
 +
Banners social media
 +
 +
* Roel will make drafts, for banners, meet with henriette
 +
 +
 +
Proto will temporarily move to orange hall
 +
 +
* We don’t know when yet
 +
 +
* Will take a couple of weeks, we need to plan/agree with everything
 +
 +
* At some point we will move, takes ca 6 weeks total
 +
 +
* We need to plan out the workshops because we cannot work in orange hall
 +
 +
* We have to empty proto at some point, including stage
 +
 +
* Roel will ask around for a place to store the huge thing maybe outside, or throw it away?
 +
 +
 +
Floor will be refurbished
 +
 +
* Circuit boards are not (?) reprogrammable, we shoud check, unsure, check with Thomas
 +
 +
 +
Speakers aurelie
 +
 +
* 5th of december, in morning
 +
 +
* Pirouz, look up his info, eg his tudelft, algorithm layout
 +
 +
 +
Workshops
 +
 +
* Work in groups so figure it out yourself
 +
 +
* First is here, 25th September
 +
 +
* DEA workshop is in schedule
 +
 +
 +
 +
Action:
 +
 +
* Roel: Logo's/banners social media, emails speakers
 +
 +
*

Revision as of 12:39, 13 September 2017


Lunch Meeting 2017-09-13

Present: Henriette, Sina, Vera, Jerrold, Roel

Topics for discussion: Roel: email topic lecture Pirouz

logo's social media

also how do i enter an enter in this page :-)


Meeting 13 9


Banners social media

  • Roel will make drafts, for banners, meet with henriette


Proto will temporarily move to orange hall

  • We don’t know when yet
  • Will take a couple of weeks, we need to plan/agree with everything
  • At some point we will move, takes ca 6 weeks total
  • We need to plan out the workshops because we cannot work in orange hall
  • We have to empty proto at some point, including stage
  • Roel will ask around for a place to store the huge thing maybe outside, or throw it away?


Floor will be refurbished

  • Circuit boards are not (?) reprogrammable, we shoud check, unsure, check with Thomas


Speakers aurelie

  • 5th of december, in morning
  • Pirouz, look up his info, eg his tudelft, algorithm layout


Workshops

  • Work in groups so figure it out yourself
  • First is here, 25th September
  • DEA workshop is in schedule


Action:

  • Roel: Logo's/banners social media, emails speakers